§ 14.04.510. Sections 4.202 - 4.202.1.1 are added to the 2016 edition of the California Green Building Standards Code to read as follows.  


Latest version.
  • Section 4.202 Renewable Energy. Sections 4.202.1 and 4.202.1.1 shall apply to residential, multifamily, mixed use buildings.

    4.202.1 Space fore Future Electrical Solar System Installation [N] Comply with Section 110.10 of the California Energy Code 4.202.1.1 Future access for Electrical Solar System [N]. For new buildings or when an existing service is relocated to new construction area, a minimum of one inch electrical conduit shall be provided from the electrical service equipment to an accessible location of the attic or other location suitable for future connection to a solar system. The conduit shall be labeled as future access for electrical solar system. The electrical panel shall be sized to accommodate the installation of future electrical solar system.

    Exception: Buildings not required to provide a solar zone per Section 110.10 of the California Energy Code.