§ 13.24.520. Flushing sewer connection needed when.  


Latest version.
  • Every industrial waste pretreatment plant shall be equipped with an adequate fresh water supply easily available for diluting and flushing, and all sewer connections shall be thoroughly flushed after discharge of each batch of industrial liquid wastes.

(Ord. 4170 § 3.12, 1950)