If upon the expiration of the 30-day period, the required work is not performed, the
city engineer shall cause the work to be performed. If, however, the premises are
unoccupied and no utility services are being furnished thereto, the city engineer
may authorize the disconnection and removal of any and all overhead service wires
and associated facilities to said property. Upon completion of the work by the city
engineer, he shall file a written report with the board setting forth the properties
disconnected and from which overhead service was removed, and the properties where
required underground facilities work has been performed by city, together with a legal
description of the property against which the cost is to be assessed, and the costs
to be assessed. The board shall fix a time and place for hearing protests against
the assessment of the cost of such work, which hearing shall not be less than 10 days
after the filing of such report.
(Ord. 4872 § 9(d), 1968)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');